Production Optimization on the Flow Shop Scheduling Problem: A Simulation Study
الموضوعات :Farshid Salehi 1 , Seyed Mojtaba Sajadi 2 , Mohammad Mehdi Karami 3
1 - Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
2 - Faculty of Entrepreneurship, New Business Department, University of Tehran, Iran
3 - Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
الکلمات المفتاحية: Simulation, Optimization, production, Bottlenecks, Queuing Systems,
ملخص المقالة :
In today's manufacturing processes, production optimization is very important to increase the competitive edge, so production managers are hardly trying to increase their production output (without increasing resources) by using different manufacturing processes and different fields of industrial engineering. These methods are used in productivity and decrease the cost of goods sold, which managers favor in all companies. This paper investigated the optimization problem in a flow shop production line with the probable time and the other constraints such as limited equipment, manufacturing process limit, by using scheduling techniques and creating a learning system by simulating. We use a simulation-based optimization approach that combines simulation and exact methods to solve the Flow Shop Scheduling problem. simulation software used to reduce the constraints and exact model used for optimizing answers that can be efficient and effective. Implementing this model with all its probable components in a high-tech pharmaceutical company with many different products increases utilization and largely to those outputs have increased by 12%.
[1] Bon, A.T. and Shahrin, N.N. 2016. Assembly Line Optimization using Arena Simulation. Proceedings of the International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia. March 8-10.
[2] Dantzig, G.B. and Ramser, J.H. 1959. The truck dispatching problem. Management Science. 6(1): 80-91.
[3] Gutjahr, A.L. and Nemhauser, G.L. 1964. An algorithm for the line balancing problem. Management science. 11(2):308-315.
[4] Papavasileiou, V., Koulouris, A., Siletti, C. and Petrides, D. 2007. Optimize manufacturing of pharmaceutical products with process simulation and production scheduling tools. Chemical Engineering Research and Design. 85(7):1086-1097.
[5] Petrides, D., Carmichael, D., Siletti, C. and Koulouris, A. 2014. Biopharmaceutical process optimization with simulation and scheduling tools. Bioengineering. 1(4): 154-187.
[6] Kulkarni, K. and Venkateswaran, J. 2015. Hybrid approach using simulation-based optimisation for job shop scheduling problems. Journal of Simulation. 9(4): 312-324.
[7] Kaylani, H. and Atieh, A.M. 2016. Simulation approach to enhance production scheduling procedures at a pharmaceutical company with large product mix. Procedia Cirp. 41:411-416.
[8] Alrabghi, A., Tiwari, A. and Savill, M. 2017. Simulation-based optimisation of maintenance systems: Industrial case studies. Journal of Manufacturing Systems. 44: 191-206.
[9] Pourhassan, M.R. and Raissi, S. 2017. An integrated simulation-based optimization technique for multi-objective dynamic facility layout problem. Journal of Industrial Information Integration. 8: 49-58.
[10] Almasarwah, N. and Süer, G. 2018. Product Scheduling in a Flowshop Cell. Procedia Manufacturing. 17: 206-213.
[11] Mendes, A.A. and Lorenzoni, M.W. 2018. Analysis and optimization of periodic inspection intervals in cold standby systems using Monte Carlo simulation. Journal of manufacturing systems. 49: 121-130.
[12] Sadegh, S., Sajadi, S.M., and Fariborz, J. 2018. A Simulation-based optimization model for determining the sequence of implementing projects related to new product development. Journal of Modern Research in Decision Making, 2(4): 129-152.
[13] González-Neira, E.M., Montoya-Torres, J.R. and Caballero-Villalobos, J.P. 2019. A comparison of dispatching rules hybridised with Monte Carlo Simulation in stochastic permutation flow shop problem. Journal of Simulation. 13(2): 128-137.
[14] SajadiAzar, S.M., Alizadeh, A., Zandieh, M. and Tavan, F. 2019. Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approach. International Journal of Mathematics in Operational Research. 14(2): 268-289.
[15] Aiassi, R., Sajadi, S.M., Hadji-Molana, S. M. and Zamani-Babgohari, A. 2020. Designing a stochastic multi-objective simulation-based optimization model for sales and operations planning in built-to-order environment with uncertain distant outsourcing. Simulation Modelling Practice and Theory. 104: 102103.
[16] Davari, A., Ganji, M. and Sajadi, S.M. 2002. An Integrated simulation-fuzzy model for preventive maintenance optimization in multi-product production firms. Journal of Simulation. Published online: 1-18.
[17] Kelton, W.D., Sadowski, R. and Zupick, N. 2014. Simulation with ARENA. : McGraw-hill. 6th Edition.