A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Subject Areas : Mathematical Optimization
Mohammad Mirabi
1
(Group of Industrial Engineering, Ayatollah Haeri University of Meybod, P.O. Box 89619-55133, Meybod, Iran)
S. M. T. Fatemi Ghomi
2
(Department of Industrial Engineering, Amirkabir University of Technology, P.O. Box 15916-34311, Tehran, Iran)
F . Jolai
3
(Department of Industrial Engineering, College of Engineering, University of Tehran, P.O. Box 14395-515, Tehran, Iran)
Keywords:
Abstract :