Performance Analysis of Remanufacturing System Considering Inspection & Grading Policies, Sourcing Policies and Resource Policies Under Multiple Quality Scenarios: Towards Environmental Sustainability
Subject Areas : Strategic ManagementMagdalene Andrew-Munot 1 , Shirley Jonathan Tanjong 2
1 - Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Malaysia Sarawak (UNIMAS), 94300 Kota Samarahan, Sarawak, Malaysia
2 - Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Malaysia Sarawak (UNIMAS), 94300 Kota Samarahan, Sarawak, Malaysia
Keywords:
Abstract :
Andrew-Munot, M., Yassin, A., Shazali, S. T., Sawawi, M., Tanjong, S. J., & Razali, N. (2018). Analysis of production planning activities in remanufacturing system. Journal of Mechanical Engineering and Sciences, 12(2), 3548-3565.
Aydin, R., Kwong, C. K., Geda, M. W., & Okudan Kremer, G. E. (2018). Determining the optimal quantity and quality levels of used product returns for remanufacturing under multi-period and uncertain quality of returns. The International Journal of Advanced Manufacturing Technology, 94, 4401-4414.
Butzer, S., Kemp, D., Steinhilper, R., & Schötz, S. (2016). Identification of approaches for remanufacturing 4.0. IEEE European Technology and Engineering Management Summit (E-TEMS), 1-6.
Caterpillar, (2019), 2019 Annual Report, [Online] Available: https://reports.caterpillar.com/ar/2019_Caterpillar_Annual_Report.pdf (February 10, 2020)
Chen, W., Wang, Y., Zhang, P., & Chen, X. (2018). Effects of an Inaccurate Sorting Procedure on Optimal Procurement and Production Decisions in a Remanufacturing System. Engineering Management Journal, 30(2), 117-127.
Devoto, C., Fernández, E., & Piñeyro, P. (2020). The economic lot-sizing problem with remanufacturing and inspection for grading heterogeneous returns. Journal of Remanufacturing, 1-17.
Fuji Xerox Australia, (2020), Eco Manufacturing Centre and Product Stewardship Program Information, [Online] Available: https://www.fujixerox.com.au/en/Sustainability/Eco-Manufacturing-Centre (March 15, 2020)
Farahani, S., Otieno, W., & Omwando, T. (2020). The optimal disposition policy for remanufacturing systems with variable quality returns. Computers & Industrial Engineering, 140, 106-218.
Gaspari, L., Colucci, L., Butzer, S., Colledani, M., & Steinhilper, R. (2017). Modularization in material flow simulation for managing production releases in remanufacturing. Journal of Remanufacturing, 7(2-3), 139-157.
GA, U. (2015). Transforming our world: the 2030 Agenda for Sustainable Development. Division for Sustainable Development Goals: New York, NY, USA.
Graham, I., Goodall, P., Peng, Y., Palmer, C., West, A., Conway, P., Mascolo, J. E., & Dettmer, F. U. (2015). Performance measurement and KPIs for remanufacturing. Journal of Remanufacturing, 5-10.
Golinska-Dawson, P, Kosacka, M, & Nowak, A. (2015). Automotive Parts Remanufacturing–Experience of Polish Small Companies. CMUJ NS Special Issue on Logistics and Supply Chain, 14, 415-430.
Gunal M.M. (2019) Simulation and the Fourth Industrial Revolution. In: Gunal M. (eds) Simulation for Industry 4.0. Springer Series in Advanced Manufacturing. (pp.1-17). Springer, Cham.
Gunal, M. M., & Karatas, M. (2019). Industry 4.0, Digitisation in Manufacturing, and Simulation: A Review of the Literature. In Gunal M. (eds) Simulation for Industry 4.0. Springer Series in Advanced Manufacturing. (pp.19-37). Springer, Cham.
HP, (2020), Remanufactured Hardware, [Online] Available: https://www8.hp.com/us/en/hp-information/environment/refurbished-products.html (March 22, 2020)
Haziri, L. L., & Sundin, E. (2019). Supporting design for remanufacturing-A framework for implementing information feedback from remanufacturing to product design.Journal of Remanufacturing, 1-20.
Iwao, M. & Kusukawa, M. (2012). Optimal production planning for remanufacturing with uncertainty in quality of returns and classification error in quality grading. Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference Osaka
Jin, X., Ni., J, & Koren, Y. (2011). Optimal control of reassembly with variable quality returns in a product remanufacturing system. CIRP Annals, 60,25-28.
Kang, T. (2013). Balancing Acquisition and Sorting Policies Of Remanufacturing. https://rc.library.uta.edu/uta-ir/handle/10106/23941 (February 21, 2020).
Karamouzian, A., Naini, S.G.J. & Mazdeh, M.M. (2014). Management of returned products to a remanufacturing facility considering arrival uncertainty and priority processing. International Journal of Operational Research, 20, 331-340.
Karamouzian, A., Teimoury, E., Modarres, M. (2011). A model for admission control of returned products in a remanufacturing facility using queuing theory. The International Journal of Advanced Manufacturing Technology, 54, 403-412.
Kelton, W., Sadowski, R., & Zupick, N. (2015). Simulation with Arena. 6th ed. Singapore
Lage Junior, M., & Godinho Filho, M. (2016). Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies. Production Planning and Control, 27(3), 212-225.
Lari, O, & Singh, H. (2015). Basics of Modelling and Simulation. S. K. Kataria & Sons
Liao, H., Deng, Q., & Shen, N. (2019). Optimal remanufacture-up-to strategy with uncertainties in acquisition quality, quantity, and market demand. Journal of Cleaner Production, 206, 987-1003.
Li, X., Li, Y., & Cai, X. (2016). On Core Sorting in RMTS and RMTO Systems: A Newsvendor Framework. Decision Sciences, 47, 60-93.
Lund, R. T., & Hauser, W. M. (2010). Remanufacturing-an American perspective.
Mashhadi, A. R., Esmaeilian, B., & Behdad, S. (2015). Uncertainty Management in Remanufacturing Decisions: A Consideration of Uncertainties in Market Demand, Quantity, and Quality of Returns. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering, 1(2).
Mashhadi, A. R., & Behdad, S. (2017). Optimal sorting policies in remanufacturing systems: Application of product life-cycle data in quality grading and end-of-use recovery. Journal of Manufacturing Systems, 43(1), 15-24.
Matsumoto, M., & Ijomah, W. (2013). Remanufacturing. In Handbook of sustainable engineering (pp. 389-408). Springer Netherlands.
Matsumoto, M., Yang, S., Martinsen, K., & Kainuma, Y. (2016). Trends and research challenges in remanufacturing. International Journal of Precision Engineering and Manufacturing-Green Technology, 3, 129-142.
Mezghani M, & Loukil T. (2012). Remanufacturing planning with imprecise quality inputs through the goal programming and the satisfaction functions. International Journal of Multicriteria Decision Making, 2, 379-390.
Mutha, A., Bansal, S., & Guide, V. D. R. (2016). Managing demand uncertainty through core acquisition in remanufacturing. Production and Operations Management, 25, 1449-1464.
Oh, Y., & Behdad, S. (2017). Simultaneous reassembly and procurement planning in assemble-to-order remanufacturing systems. International Journal of Production Economics, 184, 168-178.
Priyono, A., Ijomah, W., & Bititci, U. (2016) Disassembly for remanufacturing: A systematic literature review, new model development and future research needs. Journal of Industrial Engineering and Management, 9, 899-932.
Rockwell Automation (2020) Arena simulation software. 16 ed.
Sarda, A., & Digalwar, A. K. (2018). Performance analysis of vehicle assembly line using discrete event simulation modelling. International Journal of Business Excellence, 14(2), 240-255.
Savaliya, R., & Abdul-Kader, W. (2020). Performance evaluation of the remanufacturing system prone to random failure and repair. International Journal of Sustainable Engineering, 13(1), 33-44.
Sturrock, D. T. (2019). Traditional Simulation Applications in Industry 4.0. In In: Gunal M. (eds) Simulation for Industry 4.0. Springer Series in Advanced Manufacturing. (pp.39-54). Springer, Cham
Sundin, E., (2019), The role of remanufacturing in a circular economy: Operations, Engineering and Logistics (pp. 31-60). John Wiley & Sons.
Swanberg, L. (2018), Engines Revived, [Online] https://www.volvotrucks.com/en-lb/news/magazine-online/2018/may/remanufacturing-engines.html# (May 5, 2020)
Tao, Z., Zhou, S. X., & Tang, C. S. (2012). Managing a Remanufacturing System with Random Yield: Properties, Observations, and Heuristics. Production and Operations Management, 21, 797-813.
Teunter, R. H., & Flapper, S. D. P. (2011). Optimal core acquisition and remanufacturing policies under uncertain core quality fractions. European Journal of Operational Research, 210, 241-248.
Yang, C. H., Wang, J., & Ji, P. (2015). Optimal acquisition policy in remanufacturing under general core quality distributions. International Journal of Production Research, 53, 1425-1438.
Yang, C. H., Bao, X. Y., Song, C., & Liu, H. B. (2016A). Optimal acquisition policy in remanufacturing systems with quantity discount and carbon tax scheme. Tehnicki vjesnik, 23, 1073-1081.
Yang, C. H., Liu, H. B., Ji, P., & Ma, X. (2016B). Optimal acquisition and remanufacturing policies for multi-product remanufacturing systems. Journal of Cleaner Production, 135, 1571-1579.
Yang, C. H., Ma, X., & Talluri, S. (2019). Optimal acquisition decision in a remanufacturing system with partial random yield information. International Journal of Production Research, 57(6), 1624-1644.
Yanıkoğlu, İ., & Denizel, M. (2020). The value of quality grading in remanufacturing under quality level uncertainty. International Journal of Production Research, 1-21.
Zhang, R., Ong, S. K., & Nee, A. Y. C. (2015). A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling. Applied Soft Computing, 37, 521-532.
Zhou, J., Deng, Q., & Li, T. (2018). Optimal acquisition and remanufacturing policies considering the effect of quality uncertainty on carbon emissions. Journal of Cleaner Production, 186, 180-190.
Zheng, Y., Zhang, C., & Su, C. (2019). Simulation on Remanufacturing Cost by Considering Quality Grade of Returns and Buffer Capacity. Journal of Shanghai Jiaotong University (Science), 24(4), 471-476.
Zikopoulos, C. (2012). Remanufacturing lot-sizing under alternative perceptions of returned units' quality. International Journal of Business Science & Applied Management, 7,12-22.
Zikopoulos, C. (2017) Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns. International Journal of Production Research, 55, 1565-1587