An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
Subject Areas : طراحی آزمایشات
Bahman Naderi
1
(Department of Indusrial Engineering, Amirkabir University of Technology, Tehran, Iran)
mostafa Zandieh
2
(Department of Industrial Management, Shahid Beheshti University,G.C., Tehran, Iran)
Seyed Mohammad Taghi Fatemi Ghomi
3
(Department of Indusrial Engineering, Amirkabir University of Technology, Tehran, Iran)
Keywords:
Abstract :