A Mathematical Model for Determining the Optimal Production Lot Size of Multiple Products on a Machine
Subject Areas :
1 - Department of Industrial Engineering, College of Engineering, Kermanshah Branch, Islamic Azad
University, Kermanshah, Iran
Keywords:
Abstract :
[1] Holmbom, M. 2013. A solution procedure for economic lot scheduling problems even in high utilisation facilities. International Journal of Production Research. 51(12):3765-3777.
[2] Gallego, G., and Shaw, D. X. 1997. Complexity of the ELSP with general cyclic schedules. IIE Transactions. 29 (2): 109–113.
[3] E. W. Taft. The most economical production lot. The Iron Age. 1918. 101:1410-1412.
[4] Pentico, D.W. and Drake, M.J. 2011. A survey of deterministic models for the EOQ and EPQ with partial backordering. European Journal of Operational Research. 214:179-198.
[5] Goyal, S.K. 1973. Lot size scheduling on a single machine for stochastic demand. Management Science. 19(11):1322-1325.
[6] Kono Hirokazu,. 1994. A Singl-machine multi-product lot scheduling problem with consideration of product-dependent transportation. Journal of the Operations Research Society of Japan, 37(2):133-157.
[7] Hodgson, J.T., Ge G., King, R.E. and Said H. 1997. Dynamic lot size/sequencing policies in a multi-product, single-machine system. IIE Transactions. 29(2):127-137.
[8] Khoury, B.N., Abboud, N.E. and Tannous, M.M. 2001. The common cycle approach to the ELSP problem with insufficient capacity. International Journal of Production Economics. 73(2):189-199.
[9] Cooke, D.L., Rohleder, T.R. and Silver, E.A. 2004. Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach. International Journal of Production Research, 42(1):21-36.
[10] Yao, M.J. 2005. The economic lot scheduling problem without capacity constraints. Annals of Operations Research. 133(1-4):193-205.
[11] Leven, E. and Segerstedt, A. 2007. A scheduling policy for adjusting economic lot quantities to a feasible solution. European Journal of Operational Research. 179(2):414-423.
[12] Nilsson, K. and Segerstedt, A. 2008. Corrections of costs to feasible solutions of economic lot scheduling problems. Computers & Industrial Engineering. 54(1):155-168.
[13] Brander, P. and Segerstedt, A. 2009. Economic lot scheduling problems incorporating a cost of using the production facility. International Journal of Production Research. 47(13):3611-3624.
[14] Sun, H., Huang, HC. and Jaruphongsa, W. 2010. The economic lot scheduling problem under extended basic period and power-of-two policy. Optimization Letters, 4(2):157-172.
[15] Chan, H.K., Chung, S.H. 2010. Genetic Approach to Solve Economic Lot-Scheduling Problem. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology. Advances in Intelligent and Soft Computing, Springer, Berlin, Heidelberg.
[16] Gabay, M., Grigoriev, A., Kreuzen, V.J.C. and Oosterwijk, T. 2014. High multiplicity scheduling with switching costs for few products. Operations Research Proceedings. 437-443.
[17] Ilic, O. and Radovic, M. 2011. Models for the production runs for multiple products in flexible manufacturing system. Yugoslav Journal of Operations Research. 21(2):307-324.
[18] Al-Salamah, Muhammad. 2018. Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic. Applied Mathematical Modelling. 63:68-83.
[19] Zhang, E., Liu, Ming. , Zheng, Feifeng , and Xu, Yinfeng. 2019. Single machine lot scheduling to minimize the total weighted (discounted) completion time. Information Processing Letters. 142:46-51.
[20] Zheng, F. and Jin, K. 2019. An improved heuristic for single machine lot Scheduling problem. IFAC-Papers On Line. 52(13):217-222.
[21] Rios-Solis, Y., J. Ibarra-Rojas, O., Cabo, M. and Possani, E. 2020. A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production. European Journal of Operational Research. 284(3):861-873.
[22] Johnson, L.A. and Montgomery, D.C. 1974. Operations Research in Production Planning, Scheduling, and Inventory Control. John Wiley & Sons.