فهرست مقالات zahra sadat hosseini مقاله 1 - Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms 20.1001.1.22519904.2017.10.21.9.2 10.22094/joie.2016.263 Javad Hasanpour Mohammad Ghodoosi Zahra Sadat Hosseini Journal of Optimization in Industrial Engineering , شماره 21 , سال 10 , بهار 2017 مقاله 2 - A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities 20.1001.1.22519904.2014.7.15.2.2 zahra Sadat Hosseini Javad Hassan pour Emad Roghanian Journal of Optimization in Industrial Engineering , شماره 15 , سال 7 , پاییز 2014